Operation Jericho Pt.1

14:35 hrs.
03 Feb 15

@ 08:30 hrs the Contractor showed up to the WAYWARD INN with the Lead Hand for the crew. After a quick walk through it determined that the work would proceed.
And it did.

A protective barrier was laid down on the floors before the doors, sheet rock and studs started to come down. By the end of the day. The walls will he gone. Leaving wires tied and dangling.

More tomorrow. 